Fronton – Cracow

Construction of a production and warehouse hall with an office section, along with internal installations, technical infrastructure, road infrastructure, a water intake station, as well as the construction and expansion of external technical infrastructure.

Specyfikacja

  • Usable area: 1468.70 m²
  • Height of the hall: 8.72 m
  • Volume of the hall: 10,244 m³
  • Office part with area: 271,2 m²
  • Parking lots and maneuvering areas
  • Fire protection tank (PPOŻ)
  • Expansion and construction of technical infrastructure:
    • Rainwater sewerage system with retention tank
    • Sanitary sewerage system with sewage treatment plant
    • Pre-insulated heating network
  • Development of the area around the facility
  • Construction:
    • Foundation directly on footings,
    • Hall construction made in prefabricated reinforced concrete technology, prestressed roof girders
    • Hall cladding made of sandwich panels with rock wool core