- The total cubic capacity of the new facility is 28,342 m³
- A two-story office building, with a separate storage floor and a storage mezzanine above the production section, as well as office and social space on the second floor
- Development of the area around the new facility
- Construction:
- “mixed” foundation (direct and in part indirect)
- load-bearing structure of the object “mixed” (prefabricated reinforced concrete columns, masonry elements and steel roof structure)
- mixed” cladding of the building (traditional masonry cladding with sandwich panels, glass facade in the office part)
- roof covering with rock wool panels and PVC membrane
There are photo reports on our social media, updated on a regular basis.